TRC is preparing the engineering Plans, Specifications and Estimates to support the 2.5 mile HOV expansion addressing the following:
- Design of an interchange modification
- Widening of four bridges
- Ramp improvements
- Sound wall and retaining wall implementation
The goal of the project is to expand the current HOV network, improve existing and future traffic operations on I-5 and minimize environmental impacts. TRC will provide engineering plans to minimize weaving conflicts at the termini of the HOV lanes, reduce congestion at merge and diverge locations, and minimize right-of-way acquisition.